Elevated additions on Sullivan's Island and Isle of Palms
On the barrier islands, most of the homes we are asked to add onto are already elevated. That changes the whole job. The addition has to carry its own load down to new pilings or piers, its finished floor has to land at exactly the same height as the existing floor, and the connection between old and new framing has to be engineered so the two structures move together in wind.
The space under an elevated house has its own rules, so what you can enclose, park under, or store below the new floor is decided early, not after framing. Above the floor, we detail the envelope the way we detail a new coastal home: impact-rated openings, hurricane straps, stainless fasteners, and finishes that stand up to salt air.
Sullivan's Island adds strict height, elevation, and setback rules on top of that, and Isle of Palms has its own permit process. We design the addition to fit those rules from the first sketch so the drawings do not have to be redone after review.





